Pre-drywall findings
Missing or improperly installed insulation, plumbing vent issues, electrical runs through structural members, HVAC duct disconnections.
Final walkthrough findings
Cosmetic defects, paint coverage issues, hardware function, appliance operation, grading and drainage.
11-month warranty findings
Settlement cracks, HVAC balancing, finish defects that appeared in the first year, warranty-covered repairs the builder should address.
Why municipal inspections aren't enough
City inspectors verify code minimums. A private third-party inspector evaluates quality and works for you.
How to use your reports
Submit warranty claims with documentation. Plymouth-area builders typically respond well to documented findings.